Saturday, 2 July 2016

Learn about the diffrenet parts of ETO Sterilizer


Hello Reader , below video give the great details about the different parts of ETO Sterilizer. it shows the how complete eto sterilizer get manufactured comprising of different parts.



About Author: Shreeji Industries is pioneer manufacture & exporter of range of ETO sterilizer since decade. Company is based in state of Gujarat’s industrial hub at Ahmedabad and has extensive experience in ETO Sterilization field.

Friday, 20 May 2016

ETO Sterilization process in brief

Ethylene Oxide (EtO) sterilization is mainly used to sterilize medical and pharmaceutical products that cannot support conventional high temperature steam sterilization - such as devices that incorporate electronic components, plastic packaging or plastic containers.

It is quite important to understand how actually ETO sterilization process takes place in ETO sterilizer.

ETO Sterilization process involves three different stages. These can be separated into three different cells depending on the size or amount of devices to treat:

1.     Pre Conditioning
2.     Sterilizer
3.     Degasser

1.     Pre Conditioning Stage:
First, products need to go through a pre conditioning phase to make micro organisms grow. The batch load goes through a dwell time under a controlled environment of two main process parameter i.e. Temperature,Humidity



2.     Sterilizer Stage:
After Pre conditioning Stages, Sterilization loads goes through a long and complex sterilization cycle. Sterilization stage must fulfil following norms during the process.
  • Accurate temperature control.
  • Availability of the control system.
  • Accurate pressure and vacuum control.
  • Easy displays of process phases
  • Dedicated customer recipes.
  • Auto batching release through tolerance tests.
  • Reporting.
  • Security interlocks between actuators.
  • Alarming.
  • Shut down strategies.
  • Audit Trail facilities – Trending.
  • 21CFR Part11

     Process description of Sterilizer Stage:

During this cycle, accurate temperature control is important and a heating jacket is used. As the overall duration of this cycle is around 60 hours, high availability of the system is vital and system redundancy is required. Doubling sensors, actuators and controllers as well as changeover facilities on these components, helps to ensure the product is sterilized even on hardware or software failure.

After the doors have been shut down and sealed correctly, the cycle can be started either manually or automatically. If any problem with door sealing is detected the cycle is interlocked and cannot start. Security interlocks are also used between air and EtO valves.



Once the cycle is started, easy to use displays are required to show:

·       The actual phase of sterilization
·       All the key set points and tolerances as loaded by the recipe
·       All the key process values for the auto batch release facility

Control of vacuum and pressure is also required. Due to the toxic effect of EtO, water ring rotary pumps are used. The vacuum process needs to perform the emergency evacuation phase for a fast evacuation of gas.

The sterilization phases are:
  • Cycle start delay to enable the system to start in stable conditions
  • General cell temperature check
  • Initial vacuum phase
  • Leak rate test
  • First flush
  • Second flush
  • DEC (Dynamic Environmental Conditioning)
  • EtO gas injection
  • Sterilization dwell time period under EtO
  • Post dwell vacuum level
  • First wash
  • Second wash
  • Final air admission
  • Final chamber re-evacuation delay


During execution of these phases a batch report is generated. This report will include: tolerance checks, phase changes, alarms, events and critical process values. A key feature of the system is “auto batch” release. During the sterilization cycle if any abnormal condition occurs, the batch will be automatically stopped and condition(s) causing the stoppage will be identified. With this “auto batch” release facility operators do not have to wait until the end of the cycle and spend time going through the batch report to understand why it went wrong. With this feature, provided that batch is completed satisfactory it will be automatically forwarded to the degassing room without human check of tolerance, process values and alarms.

For each batch the operator selects appropriate product recipe. After recipe has been downloaded, the operator is given the opportunity to check if values are correct for this particular batch before starting the cycle.
When the batch is over an automatic print of the report can be performed. Batch logged files are also archived electronically for future review. Batch logged files could be searched by the following:
  • Batch ID
  • Customer name
  • Recipe
  • Product type
  • Start and stop time


3.     Degasser Stage :

Finally, products need to go through a degassing phase to remove any particle of EtO. The batch load goes over a dwell time under a temperature controlled environment.


Saturday, 7 November 2015

Fascinating Video Of Eto Sterilizer

Below is Fascinating video of Eto Sterilizer which is applicable in variety of industries such as Hospital,Laboratories,Pharmaceuticals,Life Saving Equipment,Food & Beverages,Textile & Garments,Medical Surgical Equipment.




Contact your need for state of ETO Sterilizer



Friday, 30 October 2015

Friday, 23 October 2015

The Ultimate Guide To Eto Sterilizer Process

ETO Sterilization is most well-liked method of sterilization in Medical devices as those devices can’t survive against the high temperature of most economical, well accepted low cost dry heat steam sterilizer method.

ETO Gas known as Ethylene Oxide gas is an alkaline agent that penetrates packaged medical devices to destroy microbes and thus accomplish goal of sterilization. ETO Sterilization is most acceptable method in medical device sterilization, though, ETO gas is poisonous gas so it is important to understand the process involved in ETO sterilization.

Further, Due to spontaneous nature of EO Gas, the actual ETO process must occur within enclosed chambers to prevent leaks & exposure to the ethylene oxide gas. Also EtO Sterilization is a lengthier process as it involves three stages which are pre conditioning, sterilization and Aeration.

Pre-conditioning: In this first phase, product to be sterilized passes through it which in turn enable the parasite / microbe growth. It is to preheat and humidify product loads to predefined conditions. This will assure a repeatable EO sterilization process regardless of pre-processing load storage conditions.

Sterilization: In this stage the required level of ethylene oxide is widely kept open to assure sterility for a device or family of devices.

Aeration: Lastly, the product passes through an aeration stage where even tiny droplets of ETO get removed.

ETO Sterilizer normally took 14 hour to complete this cycle.


Author:

Shreeji industries has decade of experience in designing and manufacturing the range of ETO Sterilizer for wide range of industries.

Friday, 9 October 2015

Prioritizing Eto Sterilizer Specification To Get The Most Out Of Your Sterilization need


Prioritizing Eto Sterilizer Specification To Get The Most Out Of Your Sterilization need

Shreeji industries manufacture the wide range of Eto Sterilizer for your sterilization need. Please find below selection table which will enable the customer to choose best eto sterilizer according to their need on parameters like volumetric load to be sterilized etc.



Technical Specification Selection Table:


Model Size
Feets
Capacity
(m
3)
Sterilization Cycle Time Duration
(Hours)
Pre-conditioning time
Aeration
 time
Working Pressure
(KG/CM
2)
Working Temp
(
0C)
Vaccum
Pump
(HP)
Water Circulation Pump
2 x 2 x 4
0.45
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
1
0.5 HP
3 X 3 X 6
1.46
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
1.5
0.5 HP
4 X 4 X 6
2.72
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
1.5
0.5 HP
4 x 4 x 8
3.60
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
2
1 HP
5 x 5 x 10
6.97
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
3
1 HP
5 x 5 x 15
11.25
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
3
1 HP
6 x 6 x 15
16.2
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
5
1.5 HP
6 x 6 x 20
19.44
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
5
1.5 HP
7 x 7 x 20
26.46
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
7.5
2 HP
7 x 7 x 30
44.1
8 to 12
45-90 mins
30-60 mins
1.0 to 1.5
55 to 60
10
2 HP




For more information about Prioritizing Eto Sterilizer Specification To Get The Most Out Of Your Sterilization need